Permit to Operate for the standby generators of a solar power plant

Engineer's Report, emission estimate, environmental management plan and maintenance records for the Permit to Operate of a solar power plant in Alabel, Sarangani.

The situation

A solar plant produces no stack emissions of its own, but its standby generator sets are air pollution source installations under the Clean Air Act and need a Permit to Operate. The application has to quantify emissions and show how the units are maintained and how often they run.

What EnviSoul did

  1. Engineer's Report for the Permit to Operate.
  2. Emission estimate report for the generator sets.
  3. Environmental management plan for the air sources.
  4. Preventive-maintenance schedule report and the monthly power-interruption records letter.
  5. Completed application form, with the amended ECC on file as the supporting certificate.

Deliverables

  • Engineer's Report (PTO)
  • Emission estimate report
  • Environmental management plan
  • Preventive-maintenance schedule report
  • Power-interruption records
  • Permit to Operate application set