Services

The certificate, the permits, and the maps and drawings behind both.

Applicant-side support across the Philippine EIS System, established by Presidential Decree No. 1586 and administered under DENR Administrative Order No. 2003-30 and its Revised Procedural Manual.

Permit finder

Not sure what your project needs?

Three quick questions for a first list of likely requirements.

Question 1 of 3

What kind of project is it?

All services

What we prepare.

Open any line for the detail, what you receive, and a recent example.

EIA and ECC

Delivered directly by EnviSoul.

  • IEE Checklist · IEE Report · EIS · PEIS

    Project description, baseline characterization, impact assessment, and the Environmental Management and Monitoring Plan, filed through EMB's online system and supported through the review.

    • Screening
    • Baseline
    • Impact assessment
    • EMMoP
    • Online filing

    Recent ECC prepared for a limestone crushing facility, issued 2025.

    Ask about this
  • Minor and major · EPRMP · PEPRMP

    We classify the amendment under EMB's current guidance, prepare the EPRMP or PEPRMP with an updated impact assessment and management commitments, and carry the minor riders in the same application.

    • Classification
    • EPRMP
    • PEPRMP
    • Updated EMMoP

    Recent Major ECC amendment with a 170+ page EPRMP and a nine-sheet figure suite, completed 2026.

    Ask about this
  • Screening · CNC

    We document the basis, prepare the CNC application, and advise on the operating permits that still apply.

    • Coverage screening
    • CNC application
    Ask about this
  • Air · Water · Land · People

    Ambient air and noise, water quality and hydrology, land use, slope and terrain, and socio-economic profile. Specialist studies where the project calls for them: aquifer vulnerability (DRASTIC), soil erosion and sediment yield (RUSLE), and blasting safety buffers.

    • DRASTIC
    • RUSLE
    • Noise and vibration
    • Sampling design

    Recent Air and noise sampling design, slope and terrain analysis, and receptor safety radii for a 2026 EPRMP.

    Ask about this
  • Conditions · CMR · Monitoring

    ECC condition registers, Compliance Monitoring Reports on the cadence the certificate sets, monitoring team coordination, and the record behind each commitment, quarter after quarter.

    • Condition register
    • CMR
    • Monitoring
    Ask about this

Permits and compliance

Delivered with VerdeLaya under one scope and one point of contact.

  • Generator sets · Furnaces · Crushers

    Source inventory, Engineer's Report, AP-42 and EMEP emission estimates, environmental management plan, preventive maintenance schedule, and OPMS filing.

    • Source inventory
    • Engineer's Report
    • AP-42 and EMEP
    • OPMS filing

    Recent Permit to Operate issued 2026 for a solar plant's standby generator sets.

    Ask about this
  • Septic systems to full treatment plants

    Wastewater source and outfall review, Engineer's Report, water balance, treatment facility drawings, receiving water context, and laboratory coordination.

    • Water balance
    • Engineer's Report
    • Treatment drawings
    • Laboratory coordination

    Recent Application packages and drawing sets delivered for a crushing facility and a solar power project, 2026.

    Ask about this
  • Waste streams · HWMS package

    Waste stream characterization, process mass balance, hazardous waste management plan, contingency and emergency plan, and the indexed HWMS package.

    • Mass balance
    • Management plan
    • Contingency plan
    • HWMS

    Recent Seventeen-part registration package delivered for a crushing facility, 2026.

    Ask about this
  • Designation · Training · COA

    Designation, training and Managing Head orientation coordination, and COA applications. Retained PCO service where a consultant is separately appointed and accredited for the establishment.

    • Designation
    • Training coordination
    • COA application
    Ask about this
  • Quarterly · OPMS submission

    Quarterly Self-Monitoring Reports and Compliance Monitoring Reports: module preparation, laboratory coordination, notarization, and on-time OPMS submission.

    • SMR
    • CMR
    • Notarization
    • OPMS

    Recent Self-Monitoring Report filed with notarized supporting documents, 2026.

    Ask about this
  • OPMS · CRS · HWMS · NWRB · MGB

    OPMS, CRS, and HWMS enrolment; NWRB water permit assistance; MGB submissions; CCO registration; and coordination with LGUs, BFP, Coast Guard, and CENRO where projects require it.

    • OPMS
    • CRS
    • NWRB
    • MGB
    • CCO
    Ask about this

Maps, drawings, studies

Produced in-house and issued in the formats reviewers use.

  • QGIS · A3 figure suites

    Location, topographic base, study and impact area, vicinity with receptors, site development, slope and elevation, land use and ECA overlays, sampling stations, and safety-radius maps. Also protected area, Ramsar, and cultural property proximity analyses, and lot boundary digitization from titles.

    • QGIS
    • Receptor mapping
    • ECA overlays
    • Proximity analysis

    Recent Nine-sheet A3 figure suite for a 2026 EPRMP.

    Ask about this
  • DWG · DXF · Signed PDF

    Treatment facility plans and elevations, wastewater line layouts, oil-water separator design, and multi-sheet mechanical plan sets, issued under the seal and signature of the responsible PRC-licensed engineer.

    • Treatment facilities
    • Line layouts
    • Mechanical plan sets

    Recent Ten-sheet mechanical plan set for a crushing facility, 2026.

    Ask about this
  • Balances · Estimates · Feasibility

    Signed and sealed Engineer's Reports, water and mass balances, emission estimates, DRASTIC and RUSLE studies, and mining feasibility and EPEP documentation for MGB.

    • Water balance
    • Mass balance
    • Emission estimates
    • EPEP
    Ask about this

How we work

Assess, prepare, coordinate, track.

  1. 01

    Assess

    Site visit, records review, and permit baseline: what exists, what is missing, and what the law actually requires.

  2. 02

    Prepare

    Studies, Engineer's Reports, plans, balances, maps, and forms: drafted, signed, notarized, and indexed to the agency checklist.

  3. 03

    Coordinate

    Authorized filing and follow-through with the regulator, with every submission and response documented.

  4. 04

    Track

    Milestones, certificate and permit conditions, and monitoring obligations tracked through issuance, and after it.

Deliverables you can hold

  • A written scope and requirements checklist
  • An organized, submission-ready document set
  • A milestone and action tracker
  • Map-based site evidence where applicable

Three ways to engage us

  • EIA consultancy

    ECC applications, amendments, Certificates of Non-Coverage, and the studies and maps behind them, delivered directly by EnviSoul.

  • Permitting package

    Air, water, hazardous waste, and PCO permitting delivered with VerdeLaya under one scope and one point of contact.

  • Retained compliance

    Quarterly SMR and CMR preparation, ECC and permit condition tracking, and renewal management, sustained over time.

FAQ

Questions we hear most.

  • We prepare the documentation Philippine projects need to secure an Environmental Compliance Certificate, obtain the permits that follow it, and keep both in good standing. That covers ECC applications and amendments, Certificates of Non-Coverage, baseline studies, post-ECC compliance, GIS maps, and CAD drawings. Permits to Operate, Discharge Permits, and hazardous waste registration are delivered with our affiliated firm, VerdeLaya.

  • A short description of the project or facility, its general location, the current status of the project, and any environmental documents or permits you already have. That is enough for us to identify the relevant requirements and information gaps.

  • We do not publish fixed prices. Every engagement starts with a scope and requirements review, and a quotation follows once the work involved is clear.

  • It depends on the project type and size. Projects covered by the EIS System apply for an Environmental Compliance Certificate; projects not covered get a Certificate of Non-Coverage instead. Only DENR-EMB decides which applies, based on the project description (DENR DAO 2003-30, Sections 3 and 5). We can review your project and prepare the right application.

  • An ECC covers the project as a whole and is secured before you start, under the EIS System. A Permit to Operate covers specific equipment that emits air pollution, such as a generator set, and is issued under the Clean Air Act (DENR DAO 2003-30, Section 3; DENR DAO 2000-81, Rule XIX). Many businesses need both, as separate applications.

  • No. DENR-EMB and the other regulators remain the sole evaluating and issuing authorities, and we do not control agency timelines. What we promise is complete, correct, defensible work, prepared against the current regional checklist and supported through the review.

  • VerdeLaya Environmental Consultancy Services is our affiliated firm in General Santos City, led by the same principal engineers. It delivers air, water, hazardous waste, and PCO permitting, so a client gets the ECC, the permits that follow it, and the maps and drawings under one scope and one point of contact.

  • Yes. Issued instruments, signed reports, stamped drawings, and filed monitoring reports can be presented during evaluation, subject to client consent. Client names and reference numbers are kept off this public site, so ask us for the full portfolio.

  • We are based in General Santos City, Region XII, and support projects across the Philippines. Share your project location and we will confirm availability for your exact site.

Bring the site, the documents, and the questions.

Start with a conversation about the project. You receive a written scope, a requirements checklist, and a clear sequence to filing.

CallViberEmail