Our work

Full-lifecycle work, from first screening to the amendment that followed.

Recent, regional, and verifiable. Everything here dates from 2025 to 2026 and sits before EMB Region XII and MGB Region XII, delivered by EnviSoul and with VerdeLaya.

SectorMining and quarrying
RegionRegion XII
AuthorityEMB and MGB Region XII
Delivered byEnviSoul + VerdeLaya

Limestone crushing facility

One proponent, one coordinated team: the certificate, the permits that followed it, and the amendment when the project changed.

Limestone stockpile, excavators, and a loading bay at a crushing facility in Region XII.
  • 100,000+MT per year rated capacity under the ECC
  • 170+Pages in the EPRMP for the major amendment
  • 9Sheets in the A3 figure map suite
  • 6Workstreams: air, water, waste, PCO, monitoring, MGB
  1. 2025

    Certificate

    EnviSoul prepared the Environmental Compliance Certificate application for the crushing facility. The ECC was issued in 2025.

    EnviSoul
  2. 2026

    Compliance

    VerdeLaya carried the post-ECC load: Permit to Operate with a ten-sheet mechanical plan set, Discharge Permit with treatment facility drawings, hazardous waste registration, OPMS and HWMS enrolment, Self-Monitoring Reports, and the MGB feasibility study and EPEP.

    With VerdeLaya
  3. 2026

    Amendment

    When the proponent moved to extract limestone onsite by controlled blasting, EnviSoul prepared the Major ECC Amendment: an EPRMP with blasting safety buffers, vibration and airblast commitments, an updated management and monitoring plan, minor riders, and a QGIS figure suite.

    EnviSoul
SectorRenewable energy
RegionRegion XII
AuthorityEMB Region XII
Delivered byWith VerdeLaya

Solar power project

Standby generator sets and a small treatment facility: two workstreams, one team, every document authored in-house.

Two standby generator sets under a roofed shelter at a solar power plant.
  • 5 yearsPermit validity
  • 100%Application package authored in-house
  • 3 formatsDrawings issued in DWG, DXF, PDF
  1. Air

    Permit to Operate

    VerdeLaya authored the complete application for the plant's standby generator sets: Engineer's Report, AP-42 emission estimates, environmental management plan, preventive maintenance schedule, and geotagged site evidence. The permit was issued in 2026.

    With VerdeLaya
  2. Water

    Discharge Permit package

    A parallel wastewater workstream produced the treatment facility drawing set in native DWG and DXF with a validated QA trail, and a QGIS vicinity map for the Discharge Permit application.

    With VerdeLaya

Track record

Issued, filed, and kept in good standing.

Reference numbers, client names, and exact dates are kept off this public page. They appear in the full portfolio and on the instruments themselves.

Issued instruments

  • 2025
    Environmental Compliance CertificateLimestone crushing facility · Prepared by EnviSoul
    EMB Region XII
  • 2026
    Permit to Operate (Air)Solar power plant standby generator sets · Prepared by VerdeLaya
    EMB Region XII

Documents prepared and filed, 2025 to 2026

DocumentProjectDelivered byStatus
ECC application, IEE ChecklistLimestone crushing facilityEnviSoulECC issued 2025
EPRMP, Major ECC Amendment, with nine-sheet figure suiteOnsite limestone extraction by controlled blastingEnviSoulCompleted 2026, 170+ pages
Permit to Operate application with ten-sheet mechanical plan setLimestone crushing facilityWith VerdeLayaPackage delivered 2026
Wastewater Discharge Permit application with treatment facility drawingsLimestone crushing facilityWith VerdeLayaPackage delivered 2026
Hazardous Waste Generator registration, seventeen-part packageLimestone crushing facilityWith VerdeLayaPackage delivered 2026
OPMS and HWMS enrolmentLimestone crushing facilityWith VerdeLayaEnrolled 2026
Self-Monitoring ReportLimestone crushing facilityWith VerdeLayaFiled 2026 with notarized supporting documents
MGB Mineral Processing Permit feasibility study and EPEP, with eight-sheet A3 map setLimestone crushing facilityWith VerdeLayaDelivered 2026
Permit to Operate application, standby generator setsSolar power projectWith VerdeLayaPermit issued 2026
Treatment facility drawing set and vicinity map for the Discharge Permit applicationSolar power projectWith VerdeLayaDelivered 2026 in DWG, DXF, PDF

Sample work

The sheets reviewers and builders actually use.

Open a sample to swipe through and zoom in. Scroll or pinch to zoom, and drag to move around.

Capability

Built to be reviewed, sealed, and filed.

Studies, drawings, and maps are produced in-house to a written standard.

  • EIA document standard

    Every EIS, EPRMP, and PEPRMP follows the Revised Procedural Manual: title page, project fact sheet, chapters aligned to the four EIA components, EMMoP tables, and an evidence trail, so a case handler can navigate without asking questions.

  • GIS mapping and cartography

    A governed QGIS workspace with master layout templates produces figure suites to a documented house style, each sheet carrying its scale, projection, sources, and coordinates.

  • Engineering drawings

    Drafted in-house, checked between engineers, and issued under the seal and signature of the responsible PRC-licensed engineer. Delivered drawings carry the client’s title block where required.

  • Formats and validation

    Drawings ship in DWG and DXF with signed PDF. Maps ship print-ready at A3. Reports ship as signed PDF with notarized copies where required. Every signed revision is tracked before release.

The full portfolio

Evidence behind every claim on this page.

For bids and evaluations we can present issued certificates, signed Engineer's Reports, stamped drawings, and filed monitoring reports, subject to client consent. We send the portfolio to you personally.

Request the full portfolio

Client details stay private until you ask.

  • A
    Issued instruments

    The 2025 ECC and the 2026 Permit to Operate, as issued.

  • B
    EIA documentation

    EPRMP title page, project fact sheet, and five figure map sheets.

  • C
    Engineering drawings

    As-issued mechanical and treatment facility sheets.

  • D
    Map sheets

    As-issued EPEP map sheets and a permit vicinity map.

  • E
    Registration

    DTI certificates for EnviSoul and VerdeLaya.

Bring the site, the documents, and the questions.

Start with a conversation about the project. You receive a written scope, a requirements checklist, and a clear sequence to filing.

CallViberEmail